A lot of things come into play while constructing a building for home or workplace. One of the important aspects of new construction is designing and installing a complete plumbing system. This takes a lot of time to navigate, plan, and execute the complete plumbing design so that the water supply and drainage system remain intact for years. There are a lot of things included in new construction plumbing in Atlanta.
Designing the Plumbing Plan
The most important task of local plumbing contractors is designing a complete plumbing plan according to the requirement of new construction. This means planning a complete and precise layout of the whole water, drainage, and gas supply. This plan also includes layouts of ventilation systems and waste removal pipelines. New Construction Plumbing In Atlanta has developed thanks to the latest technology and tools. Plumbing plans and layouts are now designed in no time using tools like CAD (computer-aided designs).
Complete Piping
Pipes are the most important part of the plumbing system as they are the only source of getting water in and out of the building. The normal amount of water drawn by usual water supply pipes is 50 to 60 psi. You must be careful while choosing the type and quality of pipes because the whole plumbing system is going to be relying on them. If top-quality pipes are used and maintained properly, they can last up to 40 years.
Installing Fixtures
After completing the piping in new construction plumbing in Atlanta it is time to install fixtures that are used to access water from inside a building. These fixtures include tubes, drains, bathtubs, faucets, sinks, showers, etc.